|
|
|
|
New kitchen at The Rock |
New kitchen at The Rock |
|
|
New kitchen at The Rock |
New kitchen at The Rock |
|
|
New kitchen at The Rock |
New kitchen at The Rock |
|
|
Primary school kitchen initial designs |
Primary school kitchen finished |
|
|
Wellington En-Suite before re-fit |
Wellington En-Suite before re-fit |
|
|
Wellington En-Suite after re-fit |
Wellington En-Suite after re-fit |
|
|
Wellington En-Suite after re-fit |
Wellington En-Suite after re-fit |
|
|
Wellington kitchen during re-fit |
Wellington kitchen after re-fit |
|
|
Wellington kitchen after re-fit |
Wellington kitchen after re-fit |
|
|
En-Suite at Horsehay |
En-Suite at Horsehay |
|
|
En-Suite at Horsehay |
En-Suite at Horsehay |
|
|
En-suite at The Rock |
En-suite at The Rock |
|
|
En-suite at The Rock |
En-suite at The Rock |
|
|
En-suite at The Rock |
En-suite at The Rock |
|
|
Lightmoor Village patio |
Donnington bathroom - before |
|
|
Donnington bathroom - during |
Donnington bathroom - during |
|
|
Donnington bathroom - completed
|
Donnington bathroom - completed
|
|
|
En-suite ripped out ready for
refurbishment |
Similar camera angle after
refurbishment |
|
|
Some work required on walls to make
room for shower |
Similar camera angle after
refurbishment |
|
|
Bespoke cupboards installed |
Designer radiator |
|
|
Hadley garage doors before |
Hadley garage doors after |
|
|
Wellington bathroom before |
Wellington bathroom before |
|
|
Wellington bathroom during |
Wellington bathroom during |
|
|
Wellington bathroom after |
Wellington bathroom after |
|
|
Shrewsbury bathroom refurb |
Shrewsbury bathroom refurb |
|
|
Ketley Grange bathroom refurb |
Ketley Grange bathroom refurb |
|
|
Budget kitchen refurb - Donnington -
Before |
Budget kitchen refurb - Donnington -
After |
|
|
Budget kitchen refurb - Donnington -
Before |
Budget kitchen refurb - Donnington -
After |
|
|
Budget kitchen refurb - Donnington -
Before |
Budget kitchen refurb - Donnington -
After |
|
|
Building a little shed -
granddaughter wants to help |
Preparing the base and floor |
|
|
3 x 2 framework going onto base |
walls taking shape |
|
|
roof framework with overhang |
ready for outer skin |
|
|
OSB board gives the frame real
rigidity |
Breathable membrane gives water
barrier |
|
|
Lots of Rockwool in internal cavities |
Cellotex insulation in roof |
|
|
More insulation |
Superb insulation quality |
|
|
Double glazed units in home made
window frames |
With Pilkington K energy efficient
toughened glass |
|
|
Extra insulation also improves sound
reduction |
Makes for good regular ambient
temperature |
|
|
Extra thick Cellotex insulation in
floor |
Addition water barrier topped with
22mm chipboard floor |
|
|
Outer skin fitted and painted |
Cedar wood roof shingles fitted |
|
|
Completed |
Time for internal work to be
completed |
|
|
All electrics and alarm wired in |
Bespoke phone line installed |
|
|
Ready to start work |
Cedar Wood Shingle Roof |
|
|
Coach lamps on dusk to dawn timer |
Double glazed windows and doors
|
|
|
Fully insulated walls, floor and roof
|
Externally treated with acrylic paint
|
|
|
Solid oak desk |
Oak flooring and skirting boards |
|
|
Plastered walls |
Bespoke hand made furniture |
|
|
Fully wired and certified to Part P
building regs. |
Oak theme throughout |
|
|
This wall and kitchen is coming
out........ |
to make way for the new
kitchen/diner see below |
|
|
New kitchen/diner refurbishment with
wall-out |
Integrated oven and microwave |
|
|
LED under-cupboard lighting |
Glass wall tiles |
|
|
Slate look floor tiles with
under-floor heating |
Solid oak block worktop |
|
|
Hall tiling |
With Victorian retro style tiles
|
|
|
Conservatory before refurbishment |
Conservatory after refurbishment with
new roof |
|
|
Conservatory before refurbishment |
Conservatory after refurbishment with
new roof |
|
|
Fulham school mirror fit |
Fulham school mirror fit |
|
|
Broseley utility refit |
Broseley utility refit |
|
|
Wall out and new kitchen.... |
creating large kitchen diner with
breakfast bar. |
|
|
Madeley cloakroom before
refurbishment |
Madeley cloakroom after refurbishment |
|
|
Madeley cloakroom after refurbishment |
Madeley cloakroom after refurbishment |
|
|
School Gym Mirrors Hammersmith London |
The Rock, single door converted to
French |
|
|
Shrewsbury Gym mirror installation
|
Shrewsbury Gym mirror installation |
|
|
Shrewsbury kitchen in progress |
Shrewsbury kitchen nearing completion |
|
|
Bathroom before refurb. |
Bathroom before refurb. |
|
|
Bathroom after refurb. |
Bathroom after refurb. |
|
|
Bathroom after refurb. |
Bathroom after refurb. |
|
|
Bathroom after refurb. |
Bathroom after refurb. |
|
|
En-Suite before refurb. |
En-Suite after refurb. |
|
|
En-Suite during refurb. |
En-Suite after refurb. |
|
|
En-Suite after refurb. |
En-Suite after refurb. |
|
|
Kitchen fit - London
client........ |
Partridge grey painted doors.....
|
|
|
Contrasting granite worktops........
|
With integrated appliances. |
|
|
Kitchen for Newport client ....... |
With granite worktops |
|
|
Dawley Property Refurb..............
|
New vinyl flooring........... |
|
|
Painted
throughout....................... |
New carpets throughout. |
|
|
Victorian
Conservatory Horsehay |
With Glass Roof
- Retrofit to replace old polycarbonate roof. |
|
|
Factory
Refurbishment Halesfield |
Factory
Refurbishment Halesfield |
|
|
Factory
Refurbishment Halesfield |
Factory
Refurbishment Halesfield |
|
|
Penrith Cumbria
- Mirrors |
Hadley Windows
and Doors |
|
|
Conservatory -
Before |
Conservatory -
After |
|
|
Ketley Kitchen |
Ketley Kitchen |
|
|
New Bathroom
Horsehay |
New Bathroom
Horsehay |
|
|
Home Study Fit
Pontesbury |
Home Study Fit
Pontesbury |
|
|
Factory Canteen
Stafford Park |
Factory Canteen
Stafford Park |
|
|
Factory Canteen
Stafford Park |
Ketley Kitchen
In-Progress |
|
|
Orangery
Shrewsbury |
Orangery
Shrewsbury |
|
|
Orangery
Shrewsbury |
Orangery
Shrewsbury |
|
|
Smethwick Youth Club Before |
Smethwick Youth Club During |
|
|
Smethwick Youth Club After |
Smethwick Youth Club After |
|
|
Kitchen Refurbishment in Admaston |
Kitchen Refurbishment in Admaston |
|
|
Kitchen Refurbishment in Admaston |
Kitchen Refurbishment in Stirchley
Tewksbury Oak |
|
|
Shower Refurbishment in Wem |
Shower Refurbishment in Wem |
|
|
Mirrors in Coventry School |
Mirrors in Nottingham School |
|
|
Mirrors in Nottingham School |
Mirrors in Camden School |
|
|
Yockleton Conservatory Tiling |
Admaston Conservatory Tiling |
|
|
Market Drayton Conservatory Tiling |
Car Park - Pot Hole Repair |
|
|
Bespoke Built-In Closets in Dorrington |
Bespoke Built-In Closets in Dorrington |